CLIENT BACKGROUND

  • Our client for this project is a subsidiary manufacturing facility of a large multinational corporation.
  • As a newly established site, their objectives include improving efficiency, increasing productivity, optimizing processes, and reducing overhead costs.

PROJECT OVERVIEW

This project was undertaken with the explicit goal of redesigning the layout of an existing Solich Cooling Tunnel conveyor line to optimize space and improve flow.  In addition, it involved coordinating and executing the relocation of the conveyor line to a new location, consolidating two factory spaces into one to enhance efficiency, flexibility, productivity, and reduce overhead costs.

SOLUTION

As part of our engagement with the client, our Design Engineers defined constraints and established clear objectives for the line layout.  Our Design Engineers also prioritized flexibility to accommodate the client’s future growth requirements.

Utilizing the latest technology, our Design Engineers generated 2D layouts to collaborate with the client, ensuring that the proposed designs offered the most optimal solution for both their current needs and future growth.

Upon finalization of the layout, the layout drawings were then handed to our experienced site installation teams to bring the concept to reality on site.  Utilizing the site installation teams’ vast experience and technical expertise the team was able to navigate challenges efficiently and proactively, ensuring timely completion of the equipment installation with a high-end result.

The experience and expertise of our site teams are key reasons why Jarlam are industry leaders in site installations, enabling us to deliver unparalleled products and service.  Our teams excel in delivering a quality site installation service, whilst also excelling and resolving the most complex challenges during any site installation.

BENEFITS/OUTCOME 

Through continuous collaboration with our customer, our Jarlam Design Engineers developed an optimal design emphasizing operability, efficiency, and flexibility.  With support from our experienced project management team and skilled tradesman Jarlam was able to safely and efficiently relocate the Cooling Tunnel, completing the project under budget and well ahead of schedule.  Ultimately, our client now has a production layout that achieves optimal efficiency and provides the flexibility to accommodate future growth.  We look forward to working with them in the future.